Two recent examples from Finland, just numbers, you decide if it's a little or a lot.
When phase 1 of the "Länsimetro" subway extension from Helsinki city center to adjascent area and to the nearby suburbs was completed in 2018, it had cost 1188M€ for a 13.5 km route in challenging terrain, and 8 stations. To the best I could find, phase 2 completed in 2023 with 7.5km more route and 5 more stations, and cost 1070M€. This includes the infrastructure, not the vehicles.
The Tampere tram system (started from scratch) opened in 2021. Phase 1 route length was 15 km and 23 pairs of stops, as well as 10 new bridges and such, and cost 274M€+82M€ for the vehicles. Phase 2 is 95% done and 92% paid for, and currently the 7km, 9 stop(pairs) project is estimated to come to a total of 100M€+39M€ for the vehicles.
https://www.lansimetro.fi/kustannukset/ https://yle.fi/a/3-8727469 https://en.wikipedia.org/wiki/L%C3%A4nsimetro https://www.tampereenratikka.fi/tampereen-ratikka/ratikan-kustannukset/