this post was submitted on 16 Jun 2025
26 points (84.2% liked)
Technology
72041 readers
2601 users here now
This is a most excellent place for technology news and articles.
Our Rules
- Follow the lemmy.world rules.
- Only tech related news or articles.
- Be excellent to each other!
- Mod approved content bots can post up to 10 articles per day.
- Threads asking for personal tech support may be deleted.
- Politics threads may be removed.
- No memes allowed as posts, OK to post as comments.
- Only approved bots from the list below, this includes using AI responses and summaries. To ask if your bot can be added please contact a mod.
- Check for duplicates before posting, duplicates may be removed
- Accounts 7 days and younger will have their posts automatically removed.
Approved Bots
founded 2 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
Running more than one outlet on a 220 circute is generally against us codes. It will work but don't do it.
I have a phev with only 30 miles of range - ofen I get home with a nearly dead battery and need to leave again soon - I want faster charging. I'm sure someone with 200 miles of range can be fine on 110 volt slow charging as there likely enough time over a week that it works.
I think #1 is suggesting to move the neutral over to another hot phase and change the outlet to a 240v nema 6/three prong (I think) with two hots and a ground instead of the 4 prong.
The 240v at the same amps gives you higher watts so faster charging without an expensive new conductor. I'm
Changing a 120v line over to 240 is likely also against code even if the physical cable can handle it. 120V cable is typically white/black/green, and the electrical code prohibits using the white one as a hot leg. That’s why 240V cable of the same AWG is red/black/green. The red & black legs both carry 120V.
Code allows painting the white conductor black which is what i do. Or at least it did 10 years ago when I last checked.