this post was submitted on 05 Apr 2024
1063 points (97.5% liked)

Not The Onion

12203 readers
444 users here now

Welcome

We're not The Onion! Not affiliated with them in any way! Not operated by them in any way! All the news here is real!

The Rules

Posts must be:

  1. Links to news stories from...
  2. ...credible sources, with...
  3. ...their original headlines, that...
  4. ...would make people who see the headline think, “That has got to be a story from The Onion, America’s Finest News Source.”

Comments must abide by the server rules for Lemmy.world and generally abstain from trollish, bigoted, or otherwise disruptive behavior that makes this community less fun for everyone.

And that’s basically it!

founded 1 year ago
MODERATORS
 

(water is wet and fire is hot).

you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] 79 points 7 months ago (37 children)

This just puts a huge spotlight on the thing I hate the most about my line of work. I'm sure it's not just my line of work with this problem, but there's plenty of examples of workplaces that do not have this problem.

My career is in IT support. Whether doing systems administration or networking or something else related, it's my lifeblood.

Almost every job I've ever had in this field works on the basis of tickets. A concept which, isn't in and of itself a problem, nor is it unusual. Similar systems exist in many careers; they're similar to a chit in the restaurant industry, which contains an order, which is passed to the kitchen for the cooks/chefs to complete. Same thing. And there's examples of this same idea across many careers, called all kinds of things from a requisition, to a work order, they're all variations on the same idea.

The trouble begins with how tickets are worked and completed. In other industries, you pick up a task, whether a chit or work order, you finish the task, and you mark it as complete, but in IT, it's very different in one key way. We have to not only justify and report everything we do, but also mark down exactly how long it took. It's this last point that's the problem. I am under continual scrutiny, every minute of every day to justify what I've done, and when I did it. In every job I've had, my ability to fill every second of my day with records of what I've done and how long it took to do is praised, or the lack of that ability can create some significant issues with maintaining my employment status.

There are good reasons to keep these records, to have a record of changes, and coordinate with coworkers, in the event they need to continue work I've started, or vice versa, and to note when something changed so that if issues arise, those actions can be examined as a potential cause. But this requirement has become weaponized by every employer to keep a stranglehold on productivity. If you take too long on a task that they think should have taken less time, you're suddenly found in a meeting where you have to explain why you were so inefficient. If you excel and you're able to complete your tasks quickly, that faster pace becomes the new standard, and anyone who isn't capable of keeping up gets reprimanded for dragging their heels and wasting time.

The goal posts continually move. I can't so much as take an extended shit without someone taking notice.

Meanwhile, so many jobs are simply focused on being present and looking busy. Before I went into IT, I worked at a grocery store, and short of clearly and obviously standing around doing literally nothing, no manager even took notice of you. If you were doing something, literally anything that looks even remotely productive, you were left alone. Which isn't to mention all the down time, when there isn't anything to do, and you just go and adjust the products on the shelf needlessly because it made you look busy. That same concept can be applied to a lot of different jobs, but with IT, it's not sufficient to simply look busy. Your time must be put into a ticket.

It's oppressive and the way of things in IT.

[–] [email protected] 27 points 7 months ago (5 children)

IT support

And the mentality you've described is extra bullshit in an IT or support role, as I'm sure you're aware.

This is paraphrased in the "Doom talk" I had to have with my boss back when I was working in systems maintenance. As in, he'd come into my office and complain, "Every time I come in here you're just playing Doom. You need to justify your salary or otherwise maybe we don't need to pay you."

What MBA's and PHB's don't realize is that IT and systems maintenance is not a production-oriented operation. You're not making widgets. The metric is not how many tickets do we generate and how fast are they solved. The metric is, how can we have as few tickets as possible? Because by and large what you're doing in support and IT is fixing stuff that's broken. The ideal state for the business to be in is not to have anything that's broken at all, on a minute-to-minute basis.

Boss, you want to see me in my office playing Doom. Because that means none of your millions and millions of dollars of mission critical infrastructure which your engineers rely upon to generate billable hours is on fire. If any of it catches fire today, I am on site to put it out. If anyone has a problem or a question, I am on call to solve it. If there is maintenance to be performed or new equipment to be rolled out, I'll be doing that. But otherwise I'm not going to invent busywork just to placate middle management which, as a whole, can't reliably remember which of the two mouse buttons to click.

[–] [email protected] 1 points 7 months ago (3 children)

Yeah, firefighter mentalities are terrible.

That said, as someone in software development, wouldn't there be some optimization work you could do? Keeping up with the technology? Preparing training material? Figuring out the next steps for the next improvements to be done to the system? Looking at solutions to better monitor what is going on? Scripts to automate tasks?

I find it hard to believe that things are so static.

[–] [email protected] 2 points 7 months ago

Improvements/Maintenance is no ones KPI. I'm kind of baffled by this.

load more comments (2 replies)
load more comments (3 replies)
load more comments (34 replies)