this post was submitted on 12 Nov 2024
1 points (100.0% liked)

Green Energy

2204 readers
11 users here now

Everything about energy production and storage.

Related communities:

founded 2 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[โ€“] [email protected] 0 points 2 days ago (1 children)

At the cost of making any maintenance harder, creating a very long layout so no likelihood of redundant connections, and putting breakable objects in a high impact zone

[โ€“] [email protected] 0 points 1 day ago* (last edited 1 day ago)

If the system is made well, maybe it can be very easy to drive a carriage over them and remove a lot of them relatively quickly.

I wonder if they can get away with just using a single bolt for each panel. Or maybe none, just long pins and the power connection. Unplug and lift straight up? Maybe it doesn't have to be a big issue.

I'll have to check if there are detailed plans.