[–] [email protected] 0 points 1 month ago (1 children)

In the UK, the average wait for a grid connection is more than 5 years, and over 40% of queuing projects have a connection date beyond 2030.

[–] [email protected] 0 points 1 month ago (1 children)

That's a grid connection to allow residential solar to feed back? (I thought it "just worked")

Or any grid connection, like for a new building?

[–] [email protected] 0 points 1 month ago (1 children)

I'm assuming for large scale commercial solar

[–] [email protected] 0 points 1 month ago

Ahh, I've got wrong end of the stick. TY!